Supplier: Grande
Layers: 2
Project: Racing Simulator Printed Circuit Board Assembly-Grande PCBA Manufacturing
PCB: FR4/1.6mm/1oz
Min Via: 0.2mm
Surface Treatment: HASL
Packing: Anti-static bag and compartmental packing
Standard Warp: <0.75%
PCBA Lead time: 3-4 weeks
【Description】
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing
3, Electronic Manufacturing Service
4, SMT&DIP&PTH&BGA
5, Components Sourcing
6, Quick PCBA prototype
7, X-ray test, ICT and Functional Circuit Test
8, Sample and small batch order are accepted.
PCBA ServiceCustomer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.
PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:0402, 0603, 0805, 1206, 1608, 2125, 3216Micro QFP 0.2mmFlip-chip, BGA, ConnectorsBGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on.
PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. Mass production: partial delivery according to the customer’s requirement.
Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed.
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.PCBA Standard PackingAnti-static bag and compartmental packing