1. Products description for the steel warehouse:
Main Steel | |
Steel Beam Column | Q235B , Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels | Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich Panel , PU Sandwich Panel |
Others | |
Service | Design , Fabrication and Installation |
We can offer quotations according to customers’ drawings and requirements , free design drawings and detailed installation drawings . | |
Design software : Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc | |
Packing | main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
2. Why we are your Right Choice:
1) Stable and deep financial capacity
Any investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.
2) Competitive Prices
Our production capacity(approximately 200,000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
3) Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced design software we use.
4) Fast Delivery
As professional steel warehouse supplier, we are able to design, detail, fabricate and supply simple steel buildings in approximately 4 weeks. Most of our buildings are delivered and erected within 8 weeks(this relies on various factors such as site position, weather etc).
5) Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily. Any problems that arise are quickly dealt with to minimize any delays. Safety on site is also made a priority.
3. Project case- Binzhou Tianhong Steel Structure Chemical Plant, 4500 tons:
We work as subcontractor fabricated Steel Structure for Chemical Plant, project including Detail Engineer Plan, Fabrication, Steel Structure including Equipment Platform, Pipe Bridge, Tank Structure, Steel Platform, Handrail, Ladder, we also supply the Grating and Stair Treads.
The steel structure with the advantage of quickly installation, all the steel structure fabricated in workshop and delivery to the project site for installation, connected by high strength bolt, fast and easy installation greatly shorten the construction time which reduce the costs, the whole structure is easy in maintenance, which can be used for more than 50 years.
1) Equipment Framework
Equipment Framework bear the Equipment, Framework Structure mainly welding H Steel.
2) Pipe Bridge
Pipe Bridge mainly support the pipe, truss structure, the Angle Steel and H section steel connected by welding or bolt, the structure divide upper booms,bottom booms, web member etc.
3) Steel Platform
Steel Platform is convenient for several equipment operation, Maintenance and repair.